ALERTS
SERVICE LOCATION
7261 - SMITH WAREHOUSE
DATE AND TIME
Start: 7/22/2009, 7:00:00 AM
End:   1/1/2010, 5:00:00 PM
AREA(S) AFFECTED
PARKING AREA ON BUCHANAN BLVD. 
EQUIPMENT/SERVICE
PARKING
Including these Zones and Buildings:
7261                 
DESCRIPTION:
FMD WILL CONSTRUCT A TEMPORARY VISITOR PARKING LOT IN THE AREA BETWEEN THE BUCHANAN PARKING LOT (DUKE POLICE IMPOUND LOT) AND THE RAILROAD. SEE ATTACHED AERIAL PHOTO. PEOPLE WHO ARE PRESENTLY PARKING IN THIS AREA WHO HAVE A PARKING PASS SHOULD PARK EITHER IN THE BUCHANAN LOT, NORTH SMITH LOT OR THE TEMPORARY GRAVEL LOT SOUTH OF FMD'S OFFICE. THIS IS IN SUPPORT OF THE SMITH PARKING LOT PROJECT.
CONTACT:
FLOYD WILLIAMS 919-201-6983
SERVICE LOCATION
7760 - FUQUA
DATE AND TIME
Start: 9/28/2009, 7:00:00 AM
End:   1/15/2010, 5:00:00 PM
AREA(S) AFFECTED
MECH RM C101 
EQUIPMENT/SERVICE
CW, STEAM AND HW
Including these Zones and Buildings:
7760                 
DESCRIPTION:
FMD WILL RENOVATE MECH ROOM C101. THIS IS IN SUPPORT OF THE MECHANICAL ROOM RENOVATIONS.
CONTACT:
RON DJUREN 919-201-5809
SERVICE LOCATION
7261 - SMITH WAREHOUSE
DATE AND TIME
Start: 10/7/2009, 12:00:00 PM
End:   12/7/2009, 12:00:00 PM
AREA(S) AFFECTED
MAXWELL ST & SOUTH SIDE OF SMITH WAREHOUSE 
EQUIPMENT/SERVICE
PARKING LOT
Including these Zones and Buildings:
7261                 
DESCRIPTION:
FMD WILL TEMPORARILY SHUT DOWN VEHICULAR ACCESS TO MAXWELL STEET, AS WELL AS THE SOUTH SIDE OF THE SMITH WAREHOUSE FOR THE NEXT TWO MONTHS DUE TO CONSTRUCTION OF THE SMITH WAREHOUSE/MAXWELL ST PARKING LOT. ACCESS WILL BE RETAINED FOR EMERGENCY VEHICLES ONLY. NORMAL ACCESS TO THE BUILDING SHALL BE DIRECTED TO THE NORTH SIDE ENTRANCES.
CONTACT:
DUDLEY WILLIS 919-660-4224
SERVICE LOCATION
7200 - EAST CAMPUS TUNNEL
DATE AND TIME
Start: 11/2/2009, 7:00:00 AM
End:   1/31/2010, 5:00:00 PM
AREA(S) AFFECTED
ENTIRE EAST CAMPUS TUNNEL 
EQUIPMENT/SERVICE
DOORS AND HARDWARE
Including these Zones and Buildings:
7200                 
DESCRIPTION:
FMD WILL INSTALL NEW HARDWARE ON ALL EXIT DOORS IN THE TUNNEL, ALSO RUNNING CONDUIT TO THESE DOORS. THERE WILL BE NOISE ASSOCIATED WITH THIS WORK, BUT ALL NOISY WORK WILL BEGIN AFTER 9:00 AM. THIS IS IN SUPPORT OF THE STEAM PLANT RENOVATION.
CONTACT:
LEE GUNN 919-660-1480
SERVICE LOCATION
7776 - LSRC
DATE AND TIME
Start: 11/27/2009, 7:00:00 AM
End:   11/28/2009, 11:30:00 PM
AREA(S) AFFECTED
ENTIRE BUILDING 
EQUIPMENT/SERVICE
DOMESTIC WATER
Including these Zones and Buildings:
7776                 
DESCRIPTION:
FMD WILL SHUT OFF THE DOMESTIC WATER SUPPLY TO PERFORM MODIFICATIONS TO THE SYSTEM. THERE WILL BE NO DOMESTIC WATER SERVICE AVAILABLE DURING THIS TIME. THIS IS IN SUPPORT OF THE MAIN MECHANICAL ROOM RESTORATION.
CONTACT:
MYRON TASCHUK 919-730-9627
SERVICE LOCATION
7254 - EAST CAMPUS STEAM PLANT
DATE AND TIME
Start: 11/24/2009, 9:00:00 PM
End:   11/25/2009, 2:00:00 PM
AREA(S) AFFECTED
ENTIRE EAST CAMPUS, SMITH WAREHOUSE 
EQUIPMENT/SERVICE
STEAM SYSTEM
Including these Zones and Buildings:
7254                 
DESCRIPTION:
FMD WILL PERFORM MODIFICATIONS TO THE STEAM DISTRIBUTION SYSTEM. THIS IS IN SUPPORT OF THE EAST CAMPUS STEAM PLANT PROJECT.
CONTACT:
MYRON TASCHUK 919-730-9627